Service report for smoke vent system

Certificate of inspection (August 2022)

Electrical Installation Safety Report  

Report (June 2022)

Asbestos

Asbestos re-inspection report (November 22). Identified work to encapsulate the damaged ceiling in the stairwell has been completed.

Cavity Wall Insulation

In 2014 we took advantage of a government sponsored scheme to have cavity wall insulation installed.

BBA certificate

Risk Assessment for Legionella Control

Certificate of analysis

Report

Risk Assessment for Legionella Control (June 2019)